D15 Bims

D15 Bims

06.09.2020
632

APPLICATION TYPE

• There’s no need to apply the grout on the side plane because of the engaging processes of tongued and grooved block lugs. This process accelerates the work power and also decreases the expenses. It is placed as the porous plane of the block gets upside down on the grouted plane which was prepared by applying 1-1.5 cm. grout on the place where the wall is going to be built.